California plug-in solar: SB 868 status and next checks

Check the reviewed official SB 868 status and understand the difference between passage, signing and effect. Verify current California records before installation.

Signed September 30, 2026; effective January 1, 2027

The official SB 868 record now shows Chapter 985, Statutes of 2026. It was approved by the Governor on September 30. It is a non-urgency statute; under California’s general effective-date rule it takes effect January 1, 2027. As of this October 19 review, the new exemption is not yet in force.

What a qualifying system needs

New Public Utilities Code §8530 defines a plug-in photovoltaic system with aggregate AC output of no more than 1,200 W per dwelling unit. It connects through a receptacle, offsets on-site consumption and meets the most recent National Electrical Code and California Electrical Code.

The complete system must be certified as a plug-in photovoltaic system by UL or an equivalent nationally recognized testing laboratory. It must have certified isolation preventing backfeed to the grid during an outage. A component label or a 1,200 W rating alone does not establish that the full system qualifies.

The exemption and its boundaries

Section 8531 exempts qualifying systems from utility interconnection-agreement requirements. It restricts utility demands for prior approval, related fees and additional controls, but allows a simple online registration identifying the address, manufacturer, model and size. Registration must not become an approval process. These provisions do not exempt devices outside the definition.

The reviewed §8531 includes a January 1, 2030 repeal date. A separate sales restriction for specified nonqualifying receptacle-connected systems begins January 1, 2030. These dates do not bring the exemption into force early.

Before ordering

  1. Check the current chaptered law and effective date.
  2. Match the complete equipment configuration to the certification and outage-isolation requirements.
  3. Confirm the applicable electrical, building, mounting and property requirements.
  4. Check your utility’s current registration process and how the meter treats exports.

This review covers the chaptered text and official status. It does not certify a product or verify each utility’s implementation.

Sources checked October 19, 2026

Explore a reference scenario

The Los Angeles weather reference supports a hypothetical solar and battery comparison. A weather city does not establish installation permission. Export credits or charges and time-of-use rates are not modeled.

Compare with California context and Los Angeles reference weather

See the state-law overview and grid-connected versus portable power guide.